đź“„Free Download

Free Flooring Estimate Template

Professional, itemized estimate templates designed specifically for flooring contractors. Download in Excel or print-ready PDF format.

Get Your Free Templates

Enter your email and we'll send you the download links instantly.

No spam, ever. We'll also let you know when Floor Quote Pro launches.

Excel Template (.xlsx)

Editable with auto-calculating formulas

PDF Template

Print-ready, fill by hand

What's Included in the Template

Header Section

  • Your company name, logo, and contact info
  • Customer name and address
  • Estimate number and date
  • Valid-until date

Line Items

  • Room-by-room breakdown
  • Material type and quantity (sq ft)
  • Unit price and line totals
  • Labor as separate line item

Totals Section

  • Subtotal calculation
  • Tax line (optional)
  • Deposit amount
  • Grand total

Terms & Notes

  • Payment terms
  • What's included / not included
  • Warranty information
  • Signature line for acceptance

How to Write a Flooring Estimate

A professional flooring estimate does more than list prices—it builds trust, sets expectations, and protects you from scope creep. Here's what every estimate should include:

1. Clear Company Information

Include your business name, phone, email, license number (if applicable), and address. This establishes credibility and makes it easy for customers to contact you.

2. Detailed Scope of Work

Be specific about what's included. "Install hardwood flooring" is vague. "Remove existing carpet, install 3/4" red oak hardwood (500 sq ft), install new baseboards, dispose of debris" is clear. The more detail, the fewer surprises.

3. Itemized Pricing

Break down costs by room and by type (materials, labor, removal, etc.). Customers appreciate transparency, and it helps you justify your price if they ask.

4. What's NOT Included

Explicitly state exclusions: furniture moving, subfloor repairs beyond X, appliance disconnection, etc. This prevents "I thought that was included" disputes.

5. Timeline and Validity

Include estimated start date, duration, and how long the quote is valid (usually 30 days). Material prices change—protect yourself.

Estimate vs. Quote: What's the Difference?

Estimate

An educated approximation of costs. Gives wiggle room for unexpected issues.

Use when: You haven't seen the site, or job has unknowns

Quote

A fixed price for defined work. Becomes binding when accepted.

Use when: You've inspected the site and know the full scope

Common Estimate Mistakes to Avoid

  • Forgetting waste factor — Always add 10-15% for material waste
  • Not including removal costs — Tearing out old flooring takes time
  • Vague line items — "Flooring work - $3,000" invites disputes
  • No expiration date — Material prices change; quotes should expire
  • Missing payment terms — When is deposit due? Final payment?

Skip the Spreadsheets Forever

Floor Quote Pro generates professional PDF estimates in minutes—room-by-room breakdown, automatic calculations, your branding. All from your phone.

Download Free for Android